Fujitsu T5140 User Manual

Browse online or download User Manual for Servers Fujitsu T5140. Fujitsu T5140 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 112
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews

Summary of Contents

Page 1 - Installation Guide

Installation GuideSPARC® Enterprise T5140 / T5240 Servers English

Page 2

viii SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008

Page 3 - T5140 and T5240 Servers

74 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 20082. Attach a mounting bracket to the right side of the server chassis.a.

Page 4

Appendix C Installing the Servers With the Express Rail Rackmounting Kit 75FIGURE C-6 Express Rail Slide Rails Orientation for Installation

Page 5

76 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 20085. Extend the slide rails (outer section) to fit the rack and attach th

Page 6

Appendix C Installing the Servers With the Express Rail Rackmounting Kit 77Caution – The weight of the servers on extended slide rails can be enough t

Page 7 - Contents

78 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 20084. Slide the green release tab (FIGURE C-9).5. Push the server all the

Page 8

Appendix C Installing the Servers With the Express Rail Rackmounting Kit 79Installing the Cable Management ArmThe rackmounting kit for each server com

Page 9

80 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008

Page 10

81IndexSymbols#. escape sequence for system console, 58Aaccessing ILOM command line, 45adapters for serial cables, 32address, IP, 4addresses, web, See

Page 11

82 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008installation instructions, optional components,reference, 3installingmou

Page 12

Index 83Ttermsleft and right sides, 15slide rail assembly, 10, 68TTYA serial port, 7Uuadmin command, 57unlocking mounting bracket, 71Wweb sitehttp://m

Page 13

ixFiguresFIGURE 1-1 SPARC Enterprise T5140 Server 2FIGURE 1-2 SPARC Enterprise T5240 Server 2FIGURE 1-3 Rear Panel Cable Connectors and LEDs on the SP

Page 14

84 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008

Page 16

Herausgegeben von / Published byFujitsu Siemens Computers GmbH*U41767-J-Z816-1-76 *U41767-J-Z816-1-76 Bestell-Nr./ Order No.:U41767-J-Z816-1-76

Page 17 - Related Documentation

x SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 2-12 Unlocking the Slide Rail Assembly (Either Server) 29FIGURE 2-

Page 18 - Text Conventions

xiTablesTABLE 1-1 Ethernet Connection Transfer Rates 7TABLE 3-1 Disk Slot Numbers, Logical Device Names, and Physical Device Names 55TABLE 3-2 Device

Page 19 - Prompt Notations

xii SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008

Page 20 - Alert messages in the text

xiiiPrefaceThis manual provides instructions, background information, and reference materialto help you install SPARC®Enterprise T5140 and T5240 serve

Page 21 - Important Alert Messages

xiv SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Structure and Contents of This ManualThis manual is organized as descri

Page 22 - Installation Electric shock

Preface xvRelated DocumentationThe latest versions of all the SPARC Enterprise Series manuals are available at thefollowing Web sites:http://manuals.f

Page 23 - Product Handling

xvi SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Using UNIX CommandsThis document might not contain information about ba

Page 24 - ■ Never peel off the label

Preface xviiPrompt NotationsThe following prompt notations are used in this manual.Conventions for Alert MessagesThis manual uses the following conven

Page 26 - BUSINESS REPLY MAIL

xviii SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Caution – This indicates that hazardous voltages are present. To redu

Page 27 - Preparing for Installation

Preface xixNotes on SafetyImportant Alert MessagesThis manual provides the following important alert signals:Caution – This indicates a hazardous situ

Page 28 - SPARC Enterprise T5240 Server

xx SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Caution – This indicates that hazardous voltages are present. To reduce

Page 29 - ESD Precautions

Preface xxiProduct HandlingMaintenanceWarning – Certain tasks in this manual should only be performed by a certifiedservice engineer. User must not pe

Page 30 - ■ Gateway IP address

xxii SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Alert LabelThe following is a label attached to this product: Never p

Page 31

Preface xxiii Reader's Comment Form

Page 32

xxiv SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FOLD AND TAPEFOLD AND TAPEBUSINESS REPLY MAILFIRST-CLASS MAIL PERMIT

Page 33 - Ethernet 10BASE-T 10 Mbit/sec

1CHAPTER1Preparing for InstallationThis chapter provides background information about the installation procedures forboth servers that are provided in

Page 34 - FIGURE 1-4)

2 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 1-1 SPARC Enterprise T5140 ServerFIGURE 1-2 SPARC Enterprise T5240

Page 35 - T5240 server

Chapter 1 Preparing for Installation 3Tools and Equipment NeededTo install the system, you must have the following tools: No. 2 Phillips screwdriver

Page 36 - FIGURE 1-7)

SPARC®EnterpriseT5140 and T5240 ServersInstallation GuideOrder No. U41767-J-Z816-1-76Part No. 875-4310-10February 2008, Revision A

Page 37 - Figure Legend

4 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Caution – To protect electronic components from electrostatic damage, whi

Page 38 - T5240 Server

Chapter 1 Preparing for Installation 5Tip – The serial terminal or a terminal emulator should be connected before youconnect the power cables. As soon

Page 39

6 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Refer to the SPARC Enterprise T5140 and T5240 Servers Product Notes for a

Page 40 - Safety Precautions

Chapter 1 Preparing for Installation 7 Ethernet ports are labeled NET0, NET1, NET2, and NET3. The Ethernet interfacesoperate at 10 Mbps, 100 Mbps, an

Page 41

8 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 1-3 Rear Panel Cable Connectors and LEDs on the SPARC Enterprise T

Page 42 - FIGURE 2-1)

Chapter 1 Preparing for Installation 9See FIGURE 1-5 and FIGURE 1-6 for the locations of the ports on the SPARC EnterpriseT5240 server.FIGURE 1-5 Rear

Page 43 - FIGURE 2-3)of

10 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 1-6 Front Panel USB Ports on the SPARC Enterprise T5240 ServerSli

Page 44 - Metal lever

Chapter 1 Preparing for Installation 11FIGURE 1-7 Sections of the Slide Rail Assembly on the SPARC Enterprise T5240 Server The front, middle, and rea

Page 45 - FIGURE 2-4

12 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 1-8 Locating the Locks on the Slide Rail Assembly for the SPARC E

Page 46 - FIGURE 2-5)

Chapter 1 Preparing for Installation 13Cable Management Notes for BothServersThe same cable management arm (CMA) is included with the rackmounting kit

Page 47 - Rails (Either Server)

Copyright 2008 Sun Microsystems, Inc., 4150 Network Circle, Santa Clara, California 95054, U.S.A. All rights reserved.FUJITSU LIMITED provided technic

Page 48 - FIGURE 2-7)

14 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Safety PrecautionsCaution – Deploy the antitilt bar on the equipment rac

Page 49 - FIGURE 2-8)

15CHAPTER2Installing the SPARC EnterpriseT5140 and T5240 ServersThis chapter provides instructions for installing the servers into an equipment rack.N

Page 50

16 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Note – The procedures in this chapter are the same for both the 1U and 2

Page 51 - FIGURE 2-9)

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 17c. Slide the mounting bracket release button in the direction shown inFIGURE 2-2,

Page 52 - FIGURE 2-10)

18 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 2-3 Unlocking the Slide Rail Middle Section (Either Server)2. Att

Page 53 - CMA rail extension (

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 19FIGURE 2-4 Attaching a Mounting Bracket to the Chassis (Either Server)b. Ensure th

Page 54

20 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008 If your rack does not have threaded mounting holes, the mounting screw

Page 55 - FIGURE 2-13)

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 218. Use the slide rail spacing tool to adjust the distance between the slide rails.

Page 56 - Management Port

22 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008▼ To Insert and Lock the Server in the Rack1. Deploy the antitilt bar, i

Page 57

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 233. Slide the chassis into the rack.Caution – Before continuing, verify that the se

Page 58 - FIGURE 2-16

Copyright 2008 Sun Microsystems, Inc., 4150 Network Circle, Santa Clara, California 95054, Etats-Unis. Tous droits réservés.Entrée et revue tecnical f

Page 59

24 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 2-8 Inserting the CMA Rail Extension Into the Rear of the Left Sl

Page 60 - Dismounting the Servers

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 253. Insert the smaller extension into the clip located at the end of the mountingbr

Page 61

26 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 20084. Insert the larger extension into the end of the right sliding rail (F

Page 62

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 275. Insert the hinged plastic connector at the left side of the CMA fully into theC

Page 63 - Powering On the System

28 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008▼ To Verify the Operation of the Slide Rails andthe CMATip – Two people

Page 64 - ILOM Service Processor

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 297. Pull both slide rail release buttons toward you simultaneously and slide theser

Page 65 - ■ No handshake

30 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Connecting the Server Cables for BothServersTo boot the server, you must

Page 66 - Server Connections

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 31Use this port for server management. This port is needed to set up the serviceproc

Page 67

32 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Note – The service processor network management port is configured by de

Page 68 - Parameter Description

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 33Powering on the system for the first time requires special preparation andprocedur

Page 70

34 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Caution – Verify the operation of the slide rails and CMA, and cable ser

Page 71 - Serial Management Port

Chapter 2 Installing the SPARC Enterprise T5140 and T5240 Servers 35

Page 72

36 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008

Page 73

37CHAPTER3Powering On the SystemThis chapter includes instructions for booting the servers and for enabling theservice processor network management po

Page 74

38 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Note – To see these status and error messages, connect a terminal or ter

Page 75

Chapter 3 Powering On the System 39 No handshakeA null modem configuration is needed, meaning the transmit and receive signals arereversed (crossed o

Page 76 - Network Management Port

40 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE 3-1 Server Connections4. (Optional) Connect an Ethernet cable bet

Page 77 - ▼ To Power On the System

Chapter 3 Powering On the System 41Note – Only one power connection is required for operation. Use two powerconnections for redundancy.The service pro

Page 78

42 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 20089. When prompted, follow the onscreen instructions for configuring the S

Page 79

Chapter 3 Powering On the System 4310. Log in to the server and explore its capabilities.There are many commands you can use to verify the functionali

Page 80 - Physical Device Name

vContentsPreface xiii1. Preparing for Installation 1Tools and Equipment Needed 3Optional Component Installation 3ESD Precautions 3Installation Overvie

Page 81

44 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Enabling the Service Processor NetworkManagement PortThe service process

Page 82

Chapter 3 Powering On the System 452. Configure the service processor. See “To Configure the Service Processor NetworkManagement Port” on page 47.3. C

Page 83 - ▼ To Power Cycle the System

46 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 20081. If this is the first time the system has been powered on, use the pas

Page 84

Chapter 3 Powering On the System 47▼ To Configure the Service Processor NetworkManagement PortNote – If your network allows the use of DHCP, this conf

Page 85

48 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008a. If you choose to use a dynamically created IP address (use DHCP to re

Page 86

Chapter 3 Powering On the System 49Note – After setting the configuration parameters, you must enter the set/SP/network commitpending=true command for

Page 87 - Updating the Firmware

50 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008▼ To Log Into the Service Processor Using theNetwork Management PortNote

Page 88 - ▼ To Update the Firmware

Chapter 3 Powering On the System 51▼ To Power On the System1. Perform the following steps to verify that there are no faults:a. Set the virtual keyswi

Page 89 - Setting kernel variables

52 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008c. Switch to the system console to view POST output.Watch the POST outpu

Page 90

Chapter 3 Powering On the System 534. Use the set /SYS keyswitch_state=normal command to return the virtualkeyswitch to Normal mode (default) so that

Page 91 - Selecting a Boot Device

vi SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Connecting the Server Cables for Both Servers 31▼ To Connect the Service

Page 92 - To Select a Boot Device

54 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008The CPU and memory controllers initialize, and eventually OpenBoot initi

Page 93 - Express Rail Rackmounting Kit

Chapter 3 Powering On the System 55Booting the Solaris Operating SystemThe Solaris OS is preinstalled on the servers on the disk in slot 0. The Solari

Page 94

56 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008▼ To Boot the Solaris Operating System1. At the ok prompt, boot from the

Page 95

Chapter 3 Powering On the System 57▼ To Reset the System● If it is necessary to reset the system, use the shutdown -g0 -i6 -ycommand.It is not necessa

Page 96

58 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Note – To perform an immediate and ungraceful shutdown, use the stop -fo

Page 97 - Express Rails

Chapter 3 Powering On the System 59

Page 98

60 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008

Page 99 - FIGURE C-4), then slide

61APPENDIXAUpdating the FirmwareThis appendix provides instructions for updating SP firmware. “The flashupdate command” on page 61 “Updating the Fir

Page 100 - FIGURE C-6)

62 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008▼ To Update the Firmware1. Ensure that the ILOM service processor netwo

Page 101

Appendix A Updating the Firmware 63 Full path name to the flash image that the IP address can accessThe command usage is as follows:load [-script] -s

Page 102 - FIGURE C-7)

Contents vii▼ To Power Cycle the System 57Verifying System Functionality 59A. Updating the Firmware 61The flashupdate command 61Updating the Firmware

Page 103 - FIGURE C-8)

64 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008... done.Mounting local filesystems...Cleaning /tmp /var/run /var/lock.

Page 104 - FIGURE C-9)

65APPENDIXBSelecting a Boot DeviceThis appendix provides instructions on selecting a boot device. “Selecting a Boot Device” on page 65Selecting a Boo

Page 105 - Managing Cables With the CMA

66 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008▼ To Select a Boot Device● At the ok prompt, type:where the device-spec

Page 106

67APPENDIXCInstalling the Servers With theExpress Rail Rackmounting KitThis appendix provides instructions for installing the servers in an equipment

Page 107

68 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008Slide Rail Assembly Notes for theExpress Rail Rackmounting KitThe expre

Page 108

Appendix C Installing the Servers With the Express Rail Rackmounting Kit 69 The removable mounting bracket slides 14.5 in. (37 cm) out of the slide r

Page 109 - Index 83

70 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE C-2 Locating the Locks on the Slide Rail Assembly for the SPARC

Page 110

Appendix C Installing the Servers With the Express Rail Rackmounting Kit 71Installing the Servers in a Rack WithExpress RailsNote – Ensure that you ha

Page 111

72 SPARC Enterprise T5140 and T5240 Servers Installation Guide • February 2008FIGURE C-3 Unlocking the Express Rail Slide Rail Assemblyb. Pull the mo

Page 112 - *U41767-J-Z816-1-76 *

Appendix C Installing the Servers With the Express Rail Rackmounting Kit 73c. Slide the mounting bracket release button to the left (FIGURE C-4), then

Comments to this Manuals

No comments