Fujitsu MHV2120AT User Manual Page 62

  • Download
  • Add to my manuals
  • Print
  • Page
    / 280
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 61
Theory of Device Operation
4-6 C141-E218
Start
Self-
d
iagnosis 1
- MPU bus test
- Internal register
write/read test
- Work RAM write/read
test
Power-on
a)
The spindle motor starts.
Self-
d
iagnosis 2
- Data buffer write/read
test
b)
Confirming spindle motor
speed
c)
Load the head assembly
D
rive ready state
(command waiting state)
f)
E
xecute self
-
c
alibration
e)
I
nitial on
-
t
rack and read
out of system information
d)
E
nd
4.4 Power-on Sequence
Figure 4.3 describes the operation sequence of the disk drive at power-on. The
outline is described below.
a) After the power is turned on, the disk drive executes the MPU bus test,
internal register read/write test, and work RAM read/write test. When the
self-diagnosis terminates successfully, the disk drive starts the spindle motor.
b) The disk drive executes self-diagnosis (data buffer read/write test) after
enabling response to the ATA bus.
c) After confirming that the spindle motor has reached rated speed, the head
assembly is loaded on the disk.
d) The disk drive positions the heads onto the SA area and reads out the system
information.
e) The drive becomes ready. The host can issue commands.
f) The disk drive executes self -calibration. This collects data for VCM torque
and mechanical external forces applied to the actuator, and updates the
calibrating value.
Figure 4.3 Power-on operation sequence
Page view 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 279 280

Comments to this Manuals

No comments