Page 1 - PRIMECENTER M1 19-inch Rack

User Manual - EnglishPRIMECENTER M1 19-inch RackRack System for PRIMERGY, PRIMEQUEST, BS2000, STORAGEFebruary 2012

Page 2 - Copyright and Trademarks

10 Preface© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-

Page 3 - Before reading this manual

100 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_

Page 4

101Power Distribution7.3.7.3 Installation options for 600 mm wide symmetrical racksPerforming the taskÊ Install the socket strips onto the PDU kit

Page 5 - Contents

102 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_

Page 6

103Power Distribution7.3.8.1 Installation options for 700 mm wide asymmetrical racksPerforming the taskÊ Install the PDU brackets as described on p

Page 7

104 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_

Page 8

105Power Distribution7.4 Connecting to the potential compensating systemIf required by local regulations, the PRIMECENTER M1 19-inch rack can be co

Page 9 - 1 Preface

106 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_

Page 10 - 1.1 Features

1078 Optional accessoriesVarious accessories are optionally available with the PRIMECENTER M1 19-inch rack, including:– Anti-tilt protection– Rack

Page 11

108 Optional accessories© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\0

Page 12

1099 AppendixIn this chapter you can find additional information on special tasks: – Door conversionI More information can be found at:9.1 Door con

Page 13 - 1.2 Target Group

11PrefaceThe optimized cable management patented by Fujitsu Technology Solutions is a major highlight in the asymmetrical PRIMECENTER M1 rack syste

Page 21

110 Appendix© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m

Page 22 - Important Information

12 Preface© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-

Page 23 - 3Overview

13Preface1.2 Target GroupThis manual is intended for those responsible for installing and maintaining the PRIMECENTER M1 19-inch rack (service pers

Page 24

14 Preface© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-

Page 25

15Preface1.5 Notational Conventionsbold type Used for emphasis in the body of the text“quotation marks” Used for references to other chapters, sect

Page 26

16 Preface© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-

Page 27 - 4 Preparations

172 Important Information 2.1 Safety Instructions I The following safety instructions are also provided in the manual "Safety Notes and Regula

Page 28 - Preparations

18 Important Information© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\0

Page 29

19Important InformationV CAUTION!The AC main power connection for the PRIMECENTER M1 19-inch rack must be installed by an authorized electrician ap

Page 30

Comments… Suggestions… Corrections…The User Documentation Department would like toknow your opinion of this manual. Your feedback helpsus optimize our

Page 31

20 Important Information© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\0

Page 32 - 4.5 Opening the rack door

21Important InformationFujitsu Technology Solutions GmbH Recycling CenterD-33106 PaderbornTel. ++49 5251 525 - 1410Fax ++49 5251 525 - 321410

Page 33 - 4.6.1 Inserting Cage Nuts

22 Important Information© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\0

Page 34 - 4.6.2 Inserting Spring Nuts

233OverviewThe PRIMECENTER M1 19-inch Rack is a universal rack system for the creation of integrated data center infrastructure solutions from serv

Page 35

24 Overview© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1

Page 36

25Overviewinstalled components upon removal of the upper/side covers. Optimized cable management solutions for the various rack types also play the

Page 37 - Figure 10: Height unit (HU)

26 Overview© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1

Page 38 - 5.1 Support Systems

274 PreparationsThis chapter describes the preparations for installation and all the tasks involved in setting up and operating the PRIMECENTER M1

Page 39

28 Preparations© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pc

Page 40

29Unpacking and checking the delivery unit4.1 Unpacking the delivery unitI For a description to unpack the PRIMECENTER M1 19-inch rack please refer

Page 41

Before reading this manualFor your safetyThis manual contains important information for safely and correctly using this product.Carefully read the

Page 42

30 Setting up the PRIMECENTER Rack© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\Use

Page 43

31Setting up the PRIMECENTER RackFigure 5: Adjusting the PRIMECENTER M1 19-inch rackÊ Adjust the rack on all three axes (X,Y,Z) with the leveling f

Page 44

32 Setting up the PRIMECENTER Rack© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\Use

Page 45 - Cable Inlets and Outlets

33Inserting mounting elements4.6 Inserting mounting elements4.6.1 Inserting Cage NutsIntroductionCage nuts are placed into the support uprights. A

Page 46

34 Inserting mounting elements© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Ma

Page 47

355 Preparing to install rack componentsThis chapter describes how to prepare the PRIMECENTER M1 19-inch rack to install rack components. Refer to

Page 48

36 Preparing to install rack components© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manual

Page 49

37Preparing to install rack componentsThe Height Unit (HU)The unit of measurement used in the PRIMECENTER M1 19-inch rack is the height unit (HU).

Page 50

38 Support systems© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work

Page 51

39Mounting in the front 19-inch area5.2.1 Mounting support bracketsI Support brackets are required only for asymmetrical PRIMECENTER M1 19-inch rac

Page 52

© cognitas. Gesellschft für Technik-Dokumentation mbH 2012 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en

Page 53 - 6 Cable Management

40 Mounting in the front 19-inch area© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\

Page 54

41Mounting in the rear 19-inch area5.3 Mounting in the rear 19-inch areaYou can mount additional rack components in the rear 19-inch area if:– the

Page 55

42 Mounting in the expansion area© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User

Page 56

43Mounting in the expansion area5.4.1 Mounting Rack ComponentsFigure 14: Mounting a rack component in the expansion areaÊ Remove the cover (3) from

Page 57 - 6.2.2 Disconnecting Cables

44 Cable Inlets and Outlets© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manua

Page 58 - 6.3 Routing Cables

45Cable Inlets and OutletsThe following figure shows the cable cut-outs in the bottom area in 600 mm racks:Figure 16: Cable cut-outs for cable rout

Page 59

46 Cable Inlets and Outlets© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manua

Page 60 - Performing the task

47Cable Inlets and OutletsFigure 18: Cable cut-out with edge protectorsÊ Mount the edge protectors to the cut-out (see following figure).I Make sur

Page 61

48 Cable Inlets and Outlets© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manua

Page 62

49Cable Inlets and Outlets5.5.2 Cable routing through the top coverThe 42 HU racks offer the possibility to route cables through the top cover by m

Page 63

Contents1 Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.1 Features . . . . . . . .

Page 64 - V Caution!

50 Cable Inlets and Outlets© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manua

Page 65

51Cable Inlets and OutletsFigure 23: Mounting the edge protectorÊ Mount the edge protector around the top cover cut-out to prevend cable damaging b

Page 66

52 Cable Inlets and Outlets© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manua

Page 67 - 7 Power Distribution

536 Cable ManagementThe cable management comprises the following parts:– lateral cable management (only for asymmetrical 700 mm PRIMECENTER M1 19-i

Page 68

54 Mounting the Cable Management© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User

Page 69 - 7.1 Installing PDU brackets

55Mounting the Cable Management6.1.2 Cable guide with cable clipsI The cable guide with cable clips can only be used in asymmetrical 700 mm PRIMECE

Page 70

56 Connecting and Disconnecting Cables© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals

Page 71

57Connecting and Disconnecting CablesMake sure that the cabling of devices with a "dual power feed" fulfils the conditions of the high av

Page 72

58 Connecting and Disconnecting Cables© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals

Page 73

59Connecting and Disconnecting Cables6.3.1 Routing cables in the rackThe following photo shows as a sample how to route cables in the rack:Figure 2

Page 74

Contents© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-ra

Page 75

60 Connecting and Disconnecting Cables© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals

Page 76

61Connecting and Disconnecting Cables6.3.3 Cable routing and strain relief for the built-in rack components in asymmetrical racksThe rack component

Page 77

62 Connecting and Disconnecting Cables© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals

Page 78

63Connecting and Disconnecting CablesFigure 32: Rack top view: rack component pulled out fully105% front of the Rackconnectorslateral cable managem

Page 79

64 Connecting and Disconnecting Cables© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals

Page 80

65Connecting and Disconnecting Cables6.3.5 Direct ConnectionThe example below shows how to connect cables directly to a rack component installed on

Page 81

66 Connecting and Disconnecting Cables© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals

Page 82

677 Power DistributionThe PRIMECENTER M1 19-inch rack offers various possibilities for distributing power to the integrated rack components. Theref

Page 83 - Power Distribution

68 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 84

69Power Distribution7.1 Installing PDU bracketsIntroductionAll PDUs have to be mounted using versatile mounting brackets (PDU brackets). These PDU

Page 85

Contents7.3.7 Socket strip extension 3 safety plugs and assembly . . . . . . . 987.3.8 Single-phase 4+1-way socket strip and assembly . .

Page 86

70 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 87

71Power Distribution7.2 Mounting socket strips onto PDU kit 3HUI Horizontal mounting is the only way to mount socket strips into a 600 mm rack.Figu

Page 88

72 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 89

73Power Distribution7.3 Installing the socket strips7.3.1 32 A single-phase 5-way socket strip IntroductionI For more information, see the configur

Page 90

74 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 91

75Power Distribution7.3.1.2 Installation options for 700 mm wide symmetrical racksPerforming the taskÊ Install the PDU brackets as described on pag

Page 92

76 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 93

77Power Distribution7.3.2 Single-phase 10-way socket strip w/o plugIntroductionI For more information, see the configurator: https://partners.ts.fu

Page 94

78 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 95

79Power Distribution7.3.2.2 Installation options for 700 mm wide symmetrical racksPerforming the taskÊ Install the PDU brackets as described on pag

Page 96

Contents© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-ra

Page 97

80 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 98

81Power Distribution7.3.3 32 A three-phase 15-way socket stripIntroductionI For more information, see the configurator: https://partners.ts.fujitsu

Page 99

82 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 100

83Power Distribution7.3.3.2 Installation options for 700 mm wide symmetrical racksPerforming the taskÊ Install two PDU brackets as described on pag

Page 101

84 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 102

85Power Distribution7.3.4 Three-phase 24-way socket strip IntroductionI For more information, see the configurator: https://partners.ts.fujitsu.com

Page 103

86 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 104

87Power Distribution7.3.4.2 Installation options for 700 mm wide symmetrical racksPerforming the taskÊ Install two PDU brackets as described on pag

Page 105 - Figure 73: Grounding screw

88 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 106 - 7.5 Power Supply via UPS

89Power Distribution7.3.5 Single-phase 8-way socket strip and assemblyIntroductionI For more information, see the configurator: https://partners.ts

Page 107 - 8 Optional accessories

91 PrefaceThe data centers of today and tomorrow have to meet the continuously increasing requirements and demands of operators. Fujitsu has been o

Page 108 - Optional accessories

90 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 109 - 9 Appendix

91Power Distribution7.3.5.2 Installation options for 700 mm wide symmetrical racksPerforming the taskÊ Install two PDU brackets as described on pag

Page 110

92 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 111

93Power Distribution7.3.6 Single-phase 10-way socket strip and assemblyIntroductionI For more information, see the configurator: https://partners.t

Page 112

94 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 113

95Power Distribution7.3.6.1 Installation options for 700 mm wide asymmetrical racksPerforming the taskÊ Install the PDU brackets as described on pa

Page 114

96 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 115

97Power Distribution7.3.6.3 Installation options for 600 mm wide symmetrical racksPerforming the taskÊ Install the socket strips onto the PDU kit 3

Page 116

98 Power Distribution© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_w

Page 117 - Appendix

99Power Distribution7.3.7.1 Installation options for 700 mm wide asymmetrical racksPerforming the taskÊ Install the PDU brackets as described on pa