Unpacking and checking the delivery unit
4.1 Unpacking the delivery unit
I For a description to unpack the PRIMECENTER M1 19-inch rack please
refer to the info-sheet delivered with the rack.
4.2 Rolling off the PRIMECENTER M1 19-inch
rack from the transport palette
I For a description to roll off the rack from the transport palette please refer
to the info-sheet delivered with the rack.
4.3 Setting up the PRIMECENTER M1 19-inch
rack
Introduction
To ensure that the rack has a firm foothold, it is necessary to align it in all 3 axis
exactly horizontal.
Required tools
The following tools are required to perform this task:
Hexagon key 6 mm
Spirit level