Fujitsu M1 User Manual Page 58

  • Download
  • Add to my manuals
  • Print
  • Page
    / 117
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 57
58
Connecting and Disconnecting Cables
© cognitas. Gesellschft für Technik-Dokumentation mbH 2011 Pfad: O:\FTS\PRIMERGY-HW\Rack\PCR-M1-Rack\Manuals\User Manual\02_work\pcr-m1-rack-um-en\pcrm1-rack-um-en.k06
6.3 Routing Cables
This section contains several examples of how to route cables in the
PRIMECENTER M1 19-inch rack.
Introduction
Only internal cables are routed at the factory before delivery. All other cables
must be routed during rack installation at customer site.
If one or more lateral cable managements are mounted with an installed device,
all external cables must be routed in these guides. If the installed lateral cable
managements are not sufficient for the number of cables, you must install
additional ones.
The lateral cable managements must be installed 1 HU apart. If this is not
possible, the cables must be routed in the rack before installing the device.
For easier access to the lateral cable managements you can pull out the
systems above and below the guides toward the front.
Using cable ties
Figure 27: PDU bracket with cable tie
Ê Thread a cable tie through the two openings (see circles in figure above) in
the PDU bracket
Ê Mount the PDU brackets into the groove of the rear pillars using two spring
nuts M5 and two screws M5x10 mm.
Page view 57
1 2 ... 53 54 55 56 57 58 59 60 61 62 63 ... 116 117

Comments to this Manuals

No comments